Package Contents
Note: The AP should be installed by a Certified Professional Installer.

Label | Description |
---|---|
1 | O-435E Access Point |
2 | 2 metal clamps for attaching the mounting bracket to the pole |
3 | Mounting bracket |
4 | 4 steel bosses for fixing AP in the bracket |
5 | Philips screw driver to secure the AP to the bracket |
6 | Grounding screw fitted at the back of AP with dimension 6.8 ±0.2 mm |
7 | Use Philips #2 screwdriver to tighten the screw |
8 | Grounding screw - 2.6 ±0.2 mm |
9 | Grounding screw - 5.8 ±0.2 mm |
10 | Grounding screw thread - M4 × 0.5 mm |
Important: Locate the MAC address of the AP on a label at the bottom of the product and the packaging box. Note down the MAC address before mounting the AP on the ceiling or at a hard-to-access location.
If you don't have a complete package, please contact the Arista Networks Technical Support Team at 이 이메일 주소가 스팸봇으로부터 보호됩니다. 확인하려면 자바스크립트 활성화가 필요합니다. or return the package to the vendor or dealer where you purchased the product.