Arista Networks announces the upcoming end of sale for the 7500E Series. The items covered by this announcement are listed below in Table 1. The last day to order the affected products is June 20th 2019. Customers with active support contracts will continue to receive support from Arista TAC (Technical Assistance Center) as per the dates listed in Table 2, the End-of-Life Milestones.

Migration Options

Customers are encouraged to consider migrating to 7500R Series and the 7500N chassis which deliver higher scale, greater performance and equivalent or better features.

 Affected Product Description Replacement Products  Description
DCS-7504-CH Arista 7504 empty chassis. 2 Supervisor slots, 4 Linecard slots, 6 Fabric Module slots DCS-7504N-CH Arista 7504N Empty Chassis, 2 Supervisor Slots, 4 Linecard Slots, 6 Fabric Module Slots, AC or DC option
DCS-7504E-FM Fabric-E (integrated fan) Module for 7504-E Chassis, required for fabric slots 1-6 DCS-7504R-FM 7500R Series Fabric (integrated fan) Module for 7504 Chassis, required for fabric slots 1-6
DCS-7508-CH Arista 7508 empty chassis. 2 Supervisor slots, 8 Linecard slots, 6 Fabric Module slots DCS-7508N-CH Arista 7508N Empty Chassis, 2 Supervisor Slots, 8 Linecard Slots, 6 Fabric Module Slots, AC or DC option
DCS-7508E-FM Fabric-E (integrated fan) Module for 7508-E Chassis, required for fabric slots 1-6 DCS-7508R-FM 7500R Series Fabric (integrated fan) Module for 7508 Chassis, required for fabric slots 1-6
DCS-7500E-SUP Supervisor module for 7500E series chassis DCS-7500-SUP2 Supervisor-2 module for 7500 Series
DCS-7500E-SUP-D Supervisor module for 7500E series chassis with SSD DCS-7500-SUP2-D Supervisor-2 module for 7500 Series, with SSD
PWR-2900AC 2900W AC Power Supply for 7500 series PWR-3KT-AC-RED Spare 3kW Titanium AC Power Supply for 7300 and 7500N series (red handle)

Table 1: Affected Product and Part numbers

 

Milestone Date
End-of-Sale Announcement December 20, 2018
Last day to order the products (End-of-Sale) June 20, 2019
Last day to add new service contracts June 20, 2020
Last day to request hardware failure analysis June 20, 2020
Last day to receive software bug fixes and support June 20, 2021
Last day to renew existing service contracts June 20, 2021
Last day to receive 24x7 TAC support June 20, 2022
Last day for hardware RMA requests June 20, 2022
End-of-Life of product June 20, 2022

Table 2: End-of-Life Milestones

 

For more information about the Arista End-of-Life policy, please visit: https://www.arista.com/en/support/policy/end-of-life-policy

If you need assistance with migration options, please contact your Arista sales representative or contact us at 该邮件地址已受到反垃圾邮件插件保护。要显示它需要在浏览器中启用 JavaScript。