Front Panel
This section displays the front panel of all switches this guide covers.
Note: Depending on the components used to populate the chassis, the appearance of a specific switch may differ.
Note: All switches are designed to fit in 19-inch racks.
.png)
1 | Power supplies | 4 | Linecard | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |

1 | Power supplies | 4 | Linecards | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |

1 | Power supplies | 4 | Linecard | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
.png)
1 | Power supplies | 6 | Supervisor modules | 11 | Extraction tool |
2 | Linecard and Supervisor extraction tool tether | 7 | Supervisor lock | 12 | Grounding locations |
3 | Extraction tool | 8 | Linecard | 13 | ESD attach point |
4 | Linecard | 9 | Linecard lock | ||
5 | Linecard lock | 10 | Linecard and Supervisor extraction tool tether |

1 | Power supplies | 6 | Linecard | 11 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 7 | Linecard lock | 12 | Grounding locations |
3 | Extraction tool | 8 | Supervisor module | 13 | ESD attach point |
4 | Linecard | 9 | Supervisor lock | ||
5 | Linecard lock | 10 | Supervisor module |