Front Panel
This section displays the front panel of all switches this guide covers.
Note: Depending on the components used to populate the chassis, the appearance of a specific switch may differ.
Note: All switches are designed to fit in 19-inch racks.
.png)
1 | Power supplies | 4 | linecard | 7 | Supervisor lock |
2 | linecard and Supervisor extraction tool tether | 5 | linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |

1 | Power supplies | 4 | linecards | 7 | Supervisor lock |
2 | linecard and Supervisor extraction tool tether | 5 | linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |

1 | Power supplies | 4 | linecard | 7 | Supervisor lock |
2 | linecard and Supervisor extraction tool tether | 5 | linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
.png)
1 | Power supplies | 6 | Supervisor modules | 11 | Extraction tool |
2 | linecard and Supervisor extraction tool tether | 7 | Supervisor lock | 12 | Grounding locations |
3 | Extraction tool | 8 | linecard | 13 | ESD attach point |
4 | linecard | 9 | linecard lock | ||
5 | linecard lock | 10 | linecard and Supervisor extraction tool tether |

1 | Power supplies | 6 | linecard | 11 | Supervisor lock |
2 | linecard and Supervisor extraction tool tether | 7 | linecard lock | 12 | Grounding locations |
3 | Extraction tool | 8 | Supervisor module | 13 | ESD attach point |
4 | linecard | 9 | Supervisor lock | ||
5 | linecard lock | 10 | Supervisor module |