Cabling the Modular Switch
The following topics are covered in this section:
Cabling the Power Supplies
Before you begin, refer to the Arista Networks document Compliance and Safety Guide available at: https://www.arista.com/en/support/product-documentation.
Switch | Order |
---|---|
DCS-7804 | 8, 7, 6, 5, 4, 3, 2, 1 |
DCS-7808 | 6, 12, 5, 11, 4, 10, 3, 9, 2, 8, 1, 7 |
DCS-7812 | 9, 18, 8, 17, 7, 16, 6, 15, 5, 14, 4, 13, 3, 12, 2, 11, 1, 10 |
DCS-7816 | 8, 16, 24, 7, 15, 23, 6, 14, 22, 5, 13, 21, 4, 12, 20, 3, 11, 19, 2, 10, 18, 1, 9, 17 |
The following figure shows the recommended order. All unpopulated bays should be covered with a blank (X).
Mettez le commutateur: Retirez tous les cordons d'alimentation des prises d'alimentation.
Installation de cet équipement doit être conformes aux codes électriques locaux et nationaux. Si nécessaire, consulter les organismes de réglementation appropriés et des autorités de contrôle pour assurer la conformité.
Nombreuses configurations exigera des alimentations supplémentaires.
Tous les emplacements d'approvisionnement de puissance doivent être remplis avec une alimentation ou vide pour assurer un débit d'air appropriée.
Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation.
The Table 3 shows the minimum number of operating power supplies that must be connected to active circuits for each switch to operate.
Each power supply includes a fan that maintains proper power supply temperature. The appendices display the location of components for all switches described in this guide.
Cabling Chassis Ground
The Figure 1, Figure 2, Figure 3, and Figure 4 display the location of the chassis grounding locations on the front panel of the switches. Chassis ground locations are also located on the rear panel of the switch chassis. After mounting the switch into the rack, connect at least one of the chassis grounds to the data center ground using two-hole ground lugs with 16 mm (5/8 in.) spacing, and two M4 x 0.7 screws. After the switch is grounded, ESD wrist straps can be grounded by connecting them to one of the attach points.
À la terre et de mise à la terre fils cosses ne sont pas fournis. Calibre des fils doit satisfaire des exigences de l'installation locale et nationale. Disponible dans le commerce 2 ou 4 AWG fil est recommandé pour les installations aux États-Unis.
Cet équipement doit être mis à la terre. Ne jamais modifier le conducteur de terre. Cet appareil nécessite de protection contre les surintensités.
Secondaire à la terre, câbles, cosses et vis (M4 x 0.7) ne sont pas fournis.
1 | Power supplies | 4 | Linecards | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
1 | Power supplies | 4 | Linecards | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
1 | Power supplies | 4 | Linecards | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
1 | Power supplies | 6 | Supervisor modules | 11 | Extraction tool |
2 | Linecard and Supervisor extraction tool tether | 7 | Supervisor lock | 12 | Grounding locations |
3 | Extraction tool | 8 | Linecards | 13 | ESD attach point |
4 | Linecards | 9 | Linecard lock | ||
5 | Linecard lock | 10 | Linecard and Supervisor extraction tool tether |
Cabling the AC Power Supplies
The switches use PWR-D1-3041-AC-BLUE (Figure 5) power supplies with SAF-D-GRID connectors on the PSU inputs. Power cables are included with the accessory kit (Table 1). To power the switch, insert the other side of the cable into the main power providing circuit.
The Front Panel displays the front panel location of the power supplies.
- The LEDs on a PSU remain lit for a period of time even after you disconnect the power and remove the PSU from the chassis. They will eventually turn off in a short while.
- The PWR-D1-3041-AC-BLUE PSU uses 2x 220 V supply inputs and uses 2 APP SAF-D-GRID 400 connectors.
Cabling the DC Power Supply
Le - 48V et câbles de batterie-retour sont une paire courir à côté de l'autre et doivent être à peu près la même longueur.
DC Power Supplies
The switches support the PWR-D2-3041-DC-BLUE DC power supply displayed in Figure 6.
Wire and Lug Preparation
Power Supply Specifications
The Table 2 shows the power supply specifications for each of the PSUs supported.
Power Supply | Maximum Output Power Rating (DC) | Input Voltage and Frequency | Maximum Input Current | Input Branch Circuit Protection |
---|---|---|---|---|
PWR-D1-3041-AC-BLUE | 3000 W | 200 to 240 VAC(nominal) 50/60 Hz (nominal) | 2x 16 A | 2x 20 A |
PWR-D2-3041-DC-BLUE | 3000 W | -48 V to -60 VDC, 70 A to 55A | 2x 70 A | 2x 90 A |
Chaque alimentation nécessite une protection du circuit de la branche d’entrée conformément aux exigences de l’AHJ.
Power Supply Configurations
The Table 3 shows the power supply configurations for the modular switches.
Modular Switch | Recommended Number of PSUs (for redundancy) | Number of PSUs Shipped in Bundle | Minimum Number of PSUs Required | Maximum Number of PSUs Supported |
---|---|---|---|---|
DCS-7804 | 6 | 6 | 6 | 8 |
DCS-7808 | 8 | 8 | 8 | 12 |
DCS-7812 | 10 | 10 | 10 | 18 |
DCS-7816 | 12 | 12 | 12 | 24 |
Recommendations for Power Supply Usage
- Use separate circuits (A & B) with required protection for each power supply.
- Use the same PSU model when replacing a failed PSU. Any suitable alternative must be approved before using if the original model is no longer supported or available.
- Unless your switch allows for mixing power supplies, do not mix power supply types.
- To minimize distribution power loss, use an equal number of supplies in each row: (e.g 4 PSUs in slots 1-4 and 4 PSUs in slots 7-10 for a configuration with 8 PSUs for the DCS-7808 switch). Table 1 provides more details.
Note: PSUs can be housed in either of two rows for the DCS-7808 switch. The LEDs for PSUs in each row indicate correct status only after at least one of the PSUs in that row (PSU1 to PSU6 or PSU7 to PSU12) is energized from a power source. For the DCS-7812 and DCS-7816 switches, as long as one PSU is powered, all PSU LEDs will report status correctly.
- All power supply slots must be filled with a powered supply, or a blank (X), or a non-powered power supply.
- Valid redundancy configurations for each domain are described in Power Supply Redundancy section.
Power Supply Redundancy
Installation de cet équipement doit être conformes aux codes électriques locaux et nationaux. Si nécessaire, consulter les organismes de réglementation appropriés et des autorités de contrôle pour assurer la conformité.
Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation.
Most installations will have redundant, dual, independent power feeds. Each independent power feed will be referenced as A and B.
Each power supply includes a fan that maintains proper power supply temperature. The following appendices display the location of the following component on all switches described in this guide.
The Front Panel displays the front panel location of the supervisor modules, line cards and PSUs.
The Rear Panel displays the rear panel location of fabric modules.
Cet appareil nécessite de protection contre les surintensités.
Les emplacements inutilisés doivent être occupés ou recouvert d'un blanc pour assurer la bonne circulation d'air dans le châssis.
Connecting Supervisor Cables
Supervisor modules contain console, management, and USB ports. Figure 8 displays port and status LED locations on the supervisors. Refer to the chassis specification in Figure 9 for additional information about the serial port.
1 | Locking mechanism | 5 | Line card status LED | 9 | RJ-45 Serial management port |
2 | Supervisor status LED | 6 | Fabric Module status LED | 10 | USB Ports |
3 | Supervisor active status LED | 7 | Fan status LED | 11 | RJ-45 Ethernet management port |
4 | PSU status LED | 8 | Clock In | 12 | SFP Ethernet management port |
- Console (Serial) Port:Connect to a PC with RJ-45 to DB-9 serial adapter cable. Default switch settings include:
- 9600 baud
- No flow control
- 1 stop bit
- No parity bits
- 8 data bits
The appropriate supervisor cards must be installed in one of the two slots designated for them. They are shown in Figure 9 for the DCS-7808 switch. For the DCS-7816 switch, the supervisor slots are in the middle of the chassis.
1 | Power supplies | 4 | Linecards | 7 | Supervisor lock |
2 | Linecard and Supervisor extraction tool tether | 5 | Linecard lock | 8 | Grounding locations |
3 | Extraction tool | 6 | Supervisor modules | 9 | ESD attach point |
RJ-45 to DB-9 Connections
RJ-45 | DB-9 | RJ-45 | DB-9 | ||||
---|---|---|---|---|---|---|---|
RTS | 1 | 8 | CTS | GND | 5 | 5 | GND |
DTR | 2 | 6 | DSR | RXD | 6 | 3 | TXD |
TXD | 3 | 2 | RXD | DSR | 7 | 4 | DTR |
GND | 4 | 5 | GND | CTS | 8 | 7 | RTS |
- Ethernet management port: Connect to 10/100/1000 management network with RJ-45 cable.
- USB Port: May be used for software or configuration updates.
- Clock Input Port: Port type is MCX connector, 2-5.5V, 50 ohm termination.
Connecting Line Card Modules and Cables
Install required SFP, SFP+, QSFP+, QSFP100, OSFP, and QSFP-DD optic modules in line card module ports (Figure 10).
Connect cables as required to line card module ports. Supervisor and line card module ejectors on the front of the chassis assist with cable management.
Flexion excessive peut endommager les câbles d'interface, en particulier les câbles optiques.