Package Content
Note: The AP needs to be installed by a Certified Professional Installer.
The access point (AP) package contains the components shown in the following figure:

Label | Description |
---|---|
1 | O-435 Access Point |
2 | 2 metal clamps for fixing the mounting bracket to the pole |
3 | Mounting bracket |
4 | 4 steel bosses for fixing AP in the bracket |
5 | Philips screw driver to secure the AP to the bracket |
6 | Grounding screw fitted at the back of AP with dimension 6.8 ±0.2 mm |
7 | Use Philips #2 screwdriver to tighten the screw |
8 | Grounding screw - 2.6 ±0.2 mm |
9 | Grounding screw - 5.8 ±0.2 mm |
10 | Grounding screw thread - M4 × 0.5 mm |
Important: Locate the MAC address of the AP on a label at the bottom of the product and the packaging box. Note down the MAC address before mounting the AP on the ceiling or at a location difficult to access.
If the package is not complete, please contact the Arista Networks Technical Support Team at 该邮件地址已受到反垃圾邮件插件保护。要显示它需要在浏览器中启用 JavaScript。 or return the package to the vendor or dealer where you purchased the product.